Network Group 0: Shelf 0 to Shelf 1

Connecting the 3PE faceplates in the Core/Net modules

Communication Server 1000M and Meridian 1
Cabling Common Equipment in a Single Group system
Procedure 25
Connecting the Clock Controller cables
See Figure 84 on
page
1
Connect P1 of the NT8D75 cable to port J3 of Clock Controller 0.
2
Connect P2 of the NT8D75 cable to port J3 of Clock Controller 1.
Each Single Group System contains one Network group, Group 0. Each
Network group is comprised of two Network shelves: Shelf 0 and Shelf 1.
The Core/Net modules contain Network Group 0. Shelf 0 is in Core/Net 0,
Shelf 1 is in Core/Net 1. Shelf 0 must be connected to Shelf 1 for Network
Group 0 to operate correctly.
This section contains instructions on:
1
"Connecting the 3PE faceplates in the Core/Net modules" on
2
"Inspecting CNI to 3PE factory installed cables" on
3
"Connecting the Core/Net backplanes" on
The 3PE cards in the Core/Net modules must be directly connected with an
NT8D80 cable. See Figure 81 on
between the Group 0 shelves in the Core/Net modules.
205.
End of Procedure
page
201. This connection is only made
Large System Installation and Commissioning