Coils - MOTO GUZZI NORGE GT 8V Service Station Manual

Hide thumbs Also See for NORGE GT 8V:
Table of Contents

Advertisement

Norge GT 8v
Electrical system
TABLE C1: COILS
1. Laying of the H.V. cable
Connect the spark plug hood to the other end of
the H.V. cable and repeat the laying on the left
side.
TABLE D: MAIN CABLE HARNESS
1. Injection branch.
2. Injection sub-branch.
3. Grey sheathing.
From the injection branch select the sub-branch
with three connectors of which one blue (engine
cylinder head temperature) and direct it towards
the right side of the motorbike.
Spread the injection branch inside the V of the en-
gine, so that the grey belt is positioned at the
height of the two bolts.
TABLE E: ENGINE CYLINDER HEAD TEMPER-
ATURE
1. Engine cylinder head connector.
ELE SYS - 85
Revente Interdite - Revendita Vietata - Resaling Forbiden - Wiederverkauf Verboten

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents