FINAL CHECK LIST
Before handing over the installation to the
customer it is a requirement under Document J
that the appliance is lit and the functioning of the
chimney system is checked for satisfactory
operation.
Be sure that the chimney is operating
and ALL smoke and fumes are vented to
the atmosphere through the chimney
terminal.
Check all joints and seals.
Clean the outside of the appliance to
prevent any stains becoming burnt on.
Check the flue draught which should
read 1—2mm, or 0.1—0.2 mbar.
If Building Control Consent route is being
sought please complete the check list on
page 16.
For a registered Competent Persons
Scheme, such as HETAS, please
complete the Certificate Of Compliance,
which is used for checking and reporting
the installation as imposed by the
Government
Explain the controls and operation of the
appliance to the customer.
The following details must be checked and
completed in full by the installer at the time of
installation. Please answer all questions as fully as
possible. Hamlet stoves cannot be held
responsible for the chimney or installation.