Section.9:.Radio.installation - Hangar 9 sopwith camel 60 arf Assembly Manual

Table of Contents

Advertisement

Section 9: Radio Installation
Required Parts
•.Fuselage.assembly.
1
•.22
/
".(570mm).threaded.pushrod
.
2
3
•.22
/
".(578mm)."Y".threaded.pushrod
.
4
•.Nylon.clevis.w/retainer.(3)
•.Pushrod.connector.(2)
•.Control.horn.w/backplate.(3)
•.2mm.x.12mm.machine.screw.(9)
•.Brass.pushrod.connector
•.Connector.backplate
•.3mm.x.6mm.machine.screw
Required Tools and Adhesives
•.Standard.servo.w/hardware.(3)
•.Receiver.
•.Receiver.battery.
•.Phillips.screwdriver.
•.Felt-tipped.pen.
•.. D rill.bit:.1/16".(1.5mm),.5/64".(2mm),..
3/32".(2.5mm)
We.are.finally.completing.the.major.assembly.
of.your.Sopwith.Camel..Once.you.have.
the.radio.installed,.you.should.take.a.nice.
long.break.before.starting.on.the.rigging.
.Step 1
1
Locate.the.22
/
".(570mm).threaded.pushrod..Slide.the.
.
2
pushrod.through.the.pre-installed.tube.inside.the.fuselage..
This.will.be.for.operating.the.rudder.
36
•.Pilot.figure
•.Zap-A-Dap-A-Goo
•.Switch.harness
•.Hobby.knife
•.Drill
.Step 2
3
Locate.the.22
/
".(578mm)."Y".threaded.pushrod.and.
.
4
slide.it.into.the.tubes.installed.in.the.fuselage..Take.your.
time.as.this.can.be.a.little.tricky..This.pushrod.will.be.
used.for.the.elevators.
.Step 3
Slide.a.clevis.retainer.onto.one.of.the.clevises..Thread..
the.clevis.about.14.turns.onto.one.of.the.threaded.ends..
of.a.pushrod..Repeat.this.for.all.three.of.the.threaded..
ends.of.the.pushrods.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents