Installation Requirements - Manitowoc S Model Installation Manual

S model quietqube ice machines with cvd technology
Hide thumbs Also See for S Model:
Table of Contents

Advertisement

The location selected for the ice machine must meet the following criteria. If
any of these criteria are not met, select another location.
Must have open site (gravity) drain available (see Water Supply and Drain
Requirements).
Must have a grounded, polarized electrical power supply on a dedicated
electrical circuit (only appliance on circuit). If GFCI (ground fault circuit
interrupter) is required by your local electrical code, it must be breaker type,
not outlet type.
Must have cold water supply line available at Ice Machine (see Water Supply
and Drain Requirements).
Clearance and air temperatures must be met.

Installation Requirements

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S Model and is the answer not in the manual?

Table of Contents