Installation

Location Requirements

The location selected for the ice machine
head section must meet the following
criteria. If any of these criteria are not met,
select another location.
• The location must be indoors and
must be free of airborne and other
contaminants.
• The location must not be near heat-
generating equipment or in direct
sunlight.
• The location must allow enough
clearance for water, drain, and electrical
connections in the rear of the ice
machine.
• The location must not obstruct airflow
through or around the ice machine.
Part Number 000014141 Rev 08 5/21
Section 2
Installation

Installation Requirements

• The ice machine and bin must be level.
• Vent the ice machine and bin drains
separately.
• Bin drain termination must have an air
gap.
• The ice machine and bin must be
descaled and sanitized after installation.
• The drain line must contain a union or
other suitable means of disconnection at
the ice machine.
QuietQube® Models Only
• The ice machine top panel can be
trimmed with an aviator snips to allow
the line set, water line and electrical
connections to exit the top. Only cut out
what is needed, the back panel must
support the top panel.
• The water inlet and electrical connection
must contain a service loop to allow
future access.