Verify Ice Machine and CVD® Condensing Unit Locations Are Within
Guidelines.
Prior to installation of the ice
machine head section and
CVD® condensing unit be
sure that the distance
between then is within the
line set routing guidelines.
Roof/Wall Penetration
If required, cut a 3-inch
(76.2 mm) circular hole in the
wall or roof for routing of
refrigeration tubing.
A qualified person must
perform all roof penetrations.
Roof Penetration