Inspection Control Section - Toyota 3b Repair Manual

Hide thumbs Also See for 3b:
Table of Contents

Advertisement

ENGINE MECHANICAL
-
Diesel Electrical System Diagnosis
[118 and 148]
EM-17
2.
INSPECTION CONTROL SECTION
HINT:
Perform
this
inspection
with the
intake heater connector
fully
connected.
Pre-heating Timer
Disconnect the water temp. sensor
connector.
When the ignition switch
is
turned
ON,
does
the indicator
light?
(Measure the
time
lighted)
ls
the
GAUGE
fuse
Okay?
ls
the indicator light bulb
Okay?
ls
terminal 6 of the pre-
heating timer grounded?
Open
circuit
or
ground
faulty
in
wire
harness between
terminal
7 of
the
timer
and
body
gound.
ls
there battery voltage to
terminal 8 of the timer
(on
wire
harness side)
?
Open circuit in
wire
harness
between terminal 8 of the
timer and indicator light.
ls
the lighting time
correct?
5 seconds [Below
OoC
(32oF]l
CONTINUED
ON
PAGE
EM-18

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

11b14bB

Table of Contents