Cowl Removal And Installation - Mercury 200 Verado Manual

Hide thumbs Also See for 200 Verado:
Table of Contents

Advertisement

NOTE: The outboard can be tilted or in the vertical operating
position during flushing.
1. With the engine turned off, place the outboard in either the
operating position (vertical) or in a tilted position.
2. Disconnect the flush connector from fitting on the bottom cowl.
3. Thread a water hose into the flush fitting.
4. Turn on the water tap (1/2 maximum) and let the water flush
through the cooling system for about 15 minutes.
5. When flushing is complete, turn off water and disconnect the
water hose.
6. Reinstall the flushing connector to the fitting on the bottom
cowl. Tighten the connector securely.

Cowl Removal and Installation

COWL REMOVAL
IMPORTANT: Most maintenance points are accessible by
removing the top cowl only.
MAINTENANCE
103
ob01236
ob01237

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 200 Verado and is the answer not in the manual?

This manual is also suitable for:

225 verado250 verado275 verado

Table of Contents

Save PDF