1. UNPACKING THE MACHINE
1. Use a fork truck to move the machine when packaged.
2. Take off the outer package.
3. The machine is fixed on the pallet with wooden wedges that block the
wheels.
4. Take the wedges off.
5. Using a ramp, pull the machine down from the pallet, pushing it in reverse mo-
tion. Avoid violent blows to the base.
2. BATTERY INSTALLATION
The batteries shipped with this machine are gel cell maintenance free batteries.
The two 12 volt batteries fit in the compartment under the recovery tank.
For charging maintenance, follow the instructions provided by
the charger manufacturer.
Battery Installation Instructions:
1. Lift the recovery tank forward.
2. Detach the squeegee hose (1) from the recovery tank.
3. Take off the vacuum plug (2) by rotating it counterclockwise.
4. Take the recovery tank off.
MACHINE PREPARATION
8