Kubota SM-E4B Series Workshop Manual page 46

Table of Contents

Advertisement

SM-E4B SERIES, WSM
Nozzle Holder
1. Secure the nozzle retaining nut (7) with a vise.
2. Remove the nozzle holder (1), and take out parts inside.
(When reassembling)
• Assemble the nozzle in clean fuel oil.
• Install the push rod (4), noting its direction.
• After assembling the nozzle, be sure to adjust the fuel injection
pressure.
Nozzle holder
Tightening torque
Overflow pipe retaining nut
Nozzle holder assembly
(1) Nozzle Holder
(2) Adjusting Washer
(3) Nozzle Spring
(4) Push Rod
G-25
GENERAL
35 to 39 N·m
3.5 to 4.0 kgf·m
26 to 28 lbf·ft
20 to 24 N·m
2.0 to 2.5 kgf·m
15 to 18 lbf·ft
49 to 68 N·m
5.0 to 7.0 kgf·m
37 to 50 lbf·ft
(5) Distance Piece
(6) Nozzle Piece
(7) Nozzle Retaining Nut
9Y1210785GEG0035US0
KiSC issued 01, 2013 A