Clearances To Combustibles (Ul And Ulc) - Quadra-Fire MTVERNINSAE-PMH Installation Manual

Hide thumbs Also See for MTVERNINSAE-PMH:
Table of Contents

Advertisement

MT VERNON AE INSERT
B. Clearances to Combustibles (UL and ULC)
A
C
0 inch Clearance To Exposed Section And Face Trim
Figure 8.1
Location
A
Top of Hopper
B
Side of Outside Skin
C
Back of Hopper
D
Vent Pipe to Combustible
E
Cast Side to Side Wall
Built-in Unit - Rear Vent with Outside Air
Figure 8.2
8
Built-in Unit - Rear Vent
C
B
Confi guration
Top or Rent Vent
Top or Rear Vent
Top Vent
Rear Vent
Top or Rear Vent
Top or Rear Vent
7036-188E
D
B
E
Inches
Millimeters
3
76
2
51
7-1/2
191
2-3/4
70
3
76
6
152
Failure to comply may cause house fi re.
NOTE:
Illustrations refl ect typical installations
and are FOR DESIGN PURPOSES
ONLY.
Illustrations/diagrams are not drawn to
scale.
Actual installation may vary due to
individual design preference.
WARNING
Fire Risk.
Comply with all minimum
clearances to combustibles as
specifi ed.
May 5, 2015

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mtverninsae-mbkMtverninsae-csb

Table of Contents