Stern Anchoring - Jeanneau Sun Odyssey 40 User Manual

Table of Contents

Advertisement

If your boat is fitted with an electrical windlass, keep the engine running during all
anchoring operations to avoid discharging the batteries. In case of battery failure,

STERN ANCHORING:

- Stern anchoring should be performed with the engine stopped,
- Secure the required length of the cable on the mooring cleat,
- Pay out slowly to avoid damaging the propeller or rudder blade.
All windlass operations are dangerous; therefore,
the anchor line shall always be clear and free;
Always proceed with care and using gloves.
RECOMMENDATIONS/MAINTENANCE
After every trip, rinse the windlass and anchor chain with fresh water.
Refer to the manufacture's brochure for windlass maintenance
P R E C A
U T I O N
P R E C A
U T I O N
perform the manoeuvre manually.
W
A R N I N G
W
A R N I N G
before and after the season.
index 1
4
20
58

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents