Pto Assembly Installation; Pto Handle Installation - Peco 06131512 Operator's Manual

For john deere z900 series
Table of Contents

Advertisement

2-5 PTO Assembly Installation

PTO Drive Models Only
Lift the PTO Assembly P#(A1950) into position as shown
in Figure 2-5a, inserting the PTO pivot pin into the slots
on the left and right PTO mount plates.
Sure the PTO assembly to the left and right PTO mount
plate using (1) PTO mount pin P#(B0274) and (1) hair
pin clip P#(K0086). Refer to Figure 2-5b.
Figure 2-5a
Figure 2-5b
Hair Pin
Clip
Install PTO
Handle Here
Note: Remove the gearbox pulley guard in preparation
for the belt installation. Refer to Figure 2-5c.
Figure 2-5c

2-6 PTO Handle Installation

Attach the PTO handle P#(A1142) to the PTO assembly
using (3) 1/4"-20 x 3/4" HHCS P#(K1222) and (3) 1/4"-
20 nylon flange locknuts P#(K2014). Attach the handle
Insert PTO Pivot
grip P#(J0522) to the PTO handle. Refer to Figure 2-6b.
Pin Into Slots
NOTE: The PTO Handle can be adjusted after
performing Step 2-8 to achieve proper belt adjustment.
To adjust the handle, remove (3) 1/4"-20 x 3/4" HHCS
P#(K1222) and (3) 1/4"-20 nylon flange locknuts
PTO
P#(K2014), rotate handle until positioned in the desired
Mount Pin
location (while aligning holes) and reattach. The bolts
should be kept approximately 120 degrees apart to
ensure proper fastening.
Figure 2-6
(3) 1/4"-20 x 3/4" HHCS
10
(3) 1/4"-20 Nylon
Flange Locknut
PTO Handle
Remove Gearbox
Pulley Guard
Handle Grip

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

061315150613151606131517

Table of Contents