Top Assembly To Upper Frame Assembly Installation; Hinge Kit Installation; Inlet Installation - Peco 06131512 Operator's Manual

For john deere z900 series
Table of Contents

Advertisement

2-14 Top Assembly To Upper Frame
Assembly Installation
Position the top assembly P#(A1158) above the upper
frame assembly as shown in Figure 2-14. Fasten the top
assembly to the upper frame assembly using (2) 5/16"-
18 x 2-1/2" HHCS P#(K0125) and (2) 5/16"-18 nylon
flange locknuts P#(K2516). Leave the locknuts slightly
loose, to allow the top assembly to open and close
easily. Refer to Figure 2-14 for hardware location.
(2) 5/16-18 x 2-1/2" HHCS
(2) 5/16"-18 Nylon Flange
Locknuts
2-15 Hinge Kit Assembly Installation
Assemble the hinge kit as shown in Figure 2-15, using
(2) 5/16"-18 x 1" HHCS P#(K1154), (3) 5/16"-18 nylon
flange locknuts P#(K2516), (5) 1/4" flat washers
P#(K0037) and (2) swing arm brackets P#(ZT-0004).
Place (1) vinyl cap P#(J0289) on the end of the hex bolts
as shown in Figure 2-15. Leave the nuts loose enough to
allow fluid movement of the top when opening and
closing. When opened, the top should rest on the middle
joint of the hinge allowing it to remain up.

2-16 Inlet Installation

Slide the inlet P#(V0025) into the hole on the bagger top
until the inlet locks into place. The inlet should pivot 360
degrees about the hole in the bagger top. Refer to
Figure 2-14.
Figure 2-14
Insert Inlet
From the Inside
of the Top Assembly
Figure 2-15
K1154
K2516
J0289
14
Top Assembly
Upper Frame
Assembly
K0037
ZT-0004
Inlet

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

061315150613151606131517

Table of Contents