Flue Terminal Location - Heatline solaris 24PC Installation, Servicing & User Instructions

Pre-mix condensing combination boiler
Table of Contents

Advertisement

Supplied by HeatingSpares247.com
6.6 A condensate drain pipe must be fitted to
allow discharge of condensate to a drain or
soakway.
should be discharged through plastic or
suitable corrosion resistant pipes.
Where
possible
discharged
drainage system.
discharge can be made into an external drain.
If neither of the above options are possible
then condensate must be discharged into a
purpose designed soakway.
It is recommended that any external
condensate pipe is insulated and increased
to 32mm diameter in order to prevent the
condensate from freezing.
6.7
For
requirements of BS6798 and BS5440: Part 2
must be met.
 The compartment must be of sufficient
size to permit access for inspection and
servicing or the removal of the boiler and
any ancillary equipment.
12
 Any space used for airing clothes or
storage must be separated from the
appliance by a non-combustible partition.
Where the partition is formed from
perforated
dimension of the apertures shall not exceed
13mm.
 No combustible surface must be within
20mm of the boiler casing without
protection.
 There must be 20mm clearance between
the compartment door and boiler case.
 Where the boiler's flue pipe passes
through the airing space, it must be
protected by a non-combustible sleeve or
fire stop having a minimum clearance of
20 mm between the flue pipe and sleeve.
In addition, if the flue pipe passes through
the partition then the clearance gap of the
flue pipe or its guard with the partition
must not exceed 13 mm.
6.8 When the boiler is intended for use with
LPG it must not be installed in a room or
internal space below ground level.
Note condensate is
acidic and
condensate
should
into
the
household
If this is not practical,
compartment
installation
material,
then
the

7. Flue Terminal Location

7.1 The flue terminal must be sited with minimum
clearances as specified in Figure 3.
pluming becomes problematic or causes a
be
nuisance a plume management kit is available
internal
from your stockist.
.
7.2 Current regulations and standards require a
terminal guard to be fitted where the terminal is
accessible to touch or at risk of being damaged.
All wall mounted terminals sited within 2m of the
level which people have normal access, should be
adequately protected with a suitably sited guard
7.3 Where the flue terminates within 1m of a
plastic or painted gutter or within 500mm of
the
painted eaves then protection should be provided
in the form of an aluminium shield at least 1m in
length, fitted to the underside of the gutter or
painted surface.
7.4 The flue should not be sited where the
condensate "plume" may give rise to a nuisance
factor under certain weather conditions.
NOTE: If you have difficulty siting the flue in
an appropriate location your supplier will be
happy to supply a "anti-plume management
major
kit", which discharges the flue products at a
higher level or a deflection elbow, which
deflects the plume to the left or right.
Page 12
solaris 24PC, 30PC
Note if

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solaris 30pc

Table of Contents