• If you are able to obtain hot water but not
heating it is also advisable to check the
clock connections and that the room
thermostat and time clock are calling for
heat.
• Remember that after hot water draw off
there is a 45 sec delay before the heating
will fire up if No.3 dipswitch is in the OFF
position, see fig 19 on page 27.
• When commissioning the boiler check the
inlet pressure is at 20mbar and burner
pressure against the Technical data on page
6.
• Note an anti-cycle delay time can be set up
to a maximum of 255 seconds by adjusting
potentiometer 2 as described in section 15.4
on page 27.
If you experience any problems please refer to
the installation and commissioning guidelines
within the boiler instruction manual.
necessary,
Enquiries:
For further information or advice (UK) contact
TM
Heatlin
:
10
Service please call:
0870 777 8341
Spares please call:
0870 777 8402
Technical assistance please call:
0870 777 8318NOTE – FOR
INSTALLERS:
REMEMBER
REQUIREMENT TO COMPLETE THE
BENCHMARK CODE OF PRACTICE
LOGBOOK BEFORE LEAVING THE
INSTALLATION.
please
contact
Heat
IT
IS
A
5.2 The boiler is designed to operate on fully
pumped, pressurised sealed systems operating at a
maximum of 3bar pressure and maximum design
flow temperature of 85
5.3 The boiler's integral expansion vessel is pre-
charged to a pressure of 0.5bar and will
accommodate a system volume of 125l at an
average water temperature of 75
system pressure of 3bar. If the system volume is
more than 125l an additional expansion vessel
must be fitted to suit the size of the system. A
typical installation of an additional pressure vessel
Figure 2 – Note the filter valve supplied should
is shown below in figure 2 below.
be fitted to the heating return pipe, which is on
the extreme rightof the boiler as shown below.
If
TM
Line
Domestic hot water
Heating outlet
Flow
control
valve
LEGAL
5.4 The heating circuit should be designed and
balanced to give a 20
the boiler flow and return.
5.5 When fitting a new boiler to an existing
system the system must be thoroughly flushed in
accordance with the recommendations of BS7593
prior to installation.
5.6 It is recommended that the system should be
protected by an anticorrosion inhibitor.
5.7 On installation it is important to ensure that
the heat exchanger is not a natural collection point
Page 10
solaris 24PC, 30PC
0
C.
0
C and maximum
Boiler
Cold water
supply
Flow
control
valve
Bypass
Filling
valve
device
Flow
control
valve
Heating return
0
C temperature rise across
Additional
expansion
vessel (if
required)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solaris 30pc

Table of Contents