7
Installation
Motorola recommends that only qualified personnel undertake the installation of a PTP 400
Series Bridge solution.
7.1
Preparation
Before proceeding with the installation you should:
•
Check the contents of all packages against the parts lists shown in the packing list.
•
Ensure that you have the correct tools for the job.
•
Ensure that you are qualified to undertake the work.
•
Ensure that you have taken the correct safety precautions.
•
Have completed the site planning as described in section 6 "Site Planning".
7.2
Installation Procedure
The installation procedure for a PTP 400 Series system consists of the following steps:
•
Mounting the ODUs, section 7.6
•
Connecting up, section 7.7
•
Mounting the PIDU Plus units, section 7.7.6
•
Powering Up, section 7.7.9
•
Aligning the ODUs, section 7.7.10
7.3
Tools Required
The following specific tools are required to install the PTP 400 Series Bridge in addition to
general tools:
•
13mm Spanner / Wrenche
•
RJ45 Crimp Tool
•
IBM Compatible Personal Computer (PC) running Windows 98 or later with 10 or
100baseT Ethernet (Ability to change IP settings easily is recommended)
•
Either Internet Explorer version 6 or higher, or Mozilla Firefox v1.5 or higher are
recommended.
•
Ethernet patch cable
•
6mm general purpose crimp tool for the grounding lug (
optional for lightening Protection
49
)