Installation Standard Work Checklist

This standard work checklist is to be used by the installer in conjunction with, not instead of, the instructions contained in this
installation manual.
Customer:
Lot/Address:
Model (circle one):
WARNING! Risk of Fire or Explosion! Failure to install appliance according to these instructions can
lead to a  re or explosion.
Appliance Install
Veri ed combustible or non-combustible clearances to walls. (Pg. 8)
Stove is installed level. (Pg. 35)
Venting/Chimney Section 7 (Pg 36-43)
Venting con guration complies with allowable vent requirements.
Venting installed, locked and secured in place with proper clearance.
Interior/Exterior  restops installed and sealed.
Attic insulation shield installed.
Exterior wall/Roof  ashing installed and sealed.
Terminations/Roof  ashing installed and sealed.
Electrical Section 8 (Pg 44-47)
Unswitched power (110-120 VAC) provided for the appliance.
Switch wires properly installed.
Gas Section 9 (Pg 48-49)
Appliance con guration matches fuel type.
Was a conversion performed?
Leak check performed and inlet/outlet pressure veri ed.
Set air shutter for optimal  ame appearance.
Appliance Setup Section 10 (Pg 50-53)
All packaging and protective materials are from removed inside/under/on
the appliance).
Refractories, logs, and mineral wool installed correctly.
Glass assembly installed and secured.
Accessories installed properly.
Door properly installed. Firescreen properly installed (if equipped).
Manual bag and all of its contents are removed from inside/under
the appliance and given to party responsible for use and operation.
Started appliance and veri ed no gas leaks exist.
Hearth & Home Technologies recommends the following:
• Photographing the installation and copying this checklist for your  le.
• That this checklist remain visible at all times on the appliance until the installation is complete.
Comments: Further description of the issues, who is responsible (Installer/ Builder/ Other Trades, etc) and corrective
action needed _____________________________________________________________________________________
_________________________________________________________________________________________________
_________________________________________________________________________________________________
Comments Communicated to party responsible ____________________ by ______________________on ___________
 = Contains updated information.
3
Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
ATTENTION INSTALLER:
Follow this Standard Work Checklist
TOPAZ-MBK-IPI
TOPAZ-D-PMH-IPI
TOPAZ-D-MBK-IPI
TOPAZ-D-CSB-IPI
(Builder / Gen. Contractor/) (Installer)
Date Installed:
Location of Stove:
Installer:
Dealer/Distributor Phone #
Serial #:
YES
IF NO, WHY?
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
___________________________
(Date)
2341-982 6/14