Securing And Leveling The Appliance - Quadra-Fire TOPAZ-MBK-IPI Installation Manual

Hide thumbs Also See for TOPAZ-MBK-IPI:
Table of Contents

Advertisement

B. Securing and Leveling the Appliance
WARNING! Risk of Fire! Prevent contact with combustible
materials.
WARNING! Risk of Fire! Failure to maintain air space
clearance may cause overheating and fire.
Figure 6.1
1. Thread Allen bolts through nuts until flush.
NOTE: Two Allen bolts and two nuts are included in the
component bag. Normally, only one is required on the leg
not touching the floor.
Figure 6.2
2. Slide assembled nuts and bolts into slots on legs with the
nuts on the bottom.
35
Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
Figure 6.3
3. Use a 5/32 in. (4mm) Allen wrench to adjust legs up and
down to desired level.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Topazd-pmh-ipiTopazd-mbk-ipiTopazd-csb-ipi

Table of Contents