Quadra-Fire TOPAZ-MBK-IPI Installation Manual page 55

Hide thumbs Also See for TOPAZ-MBK-IPI:
Table of Contents

Advertisement

A. Vent Components Diagrams (continued)
Note: Heat shields MUST overlap by a minimum of 1-1/2 in. (38 mm). The heat shield is designed to be
used on a wall 4 in. to 7-1/4 in. (102 mm to 184 mm) thick. If wall thickness is less than 4 in. (102 mm)
the existing heat shields must be field trimmed. If wall thickness is greater than 7-1/4 in. (184 mm) a
DVP-HSM-B will be required.
15-1/8 in.
(384 mm)
12 in.
(305 mm)
26 in.
660 mm
DVP-HSM-B
Extended Heat Shield
Figure 11.2 SLP Series Vent Components
55
Quadra-Fire • TOPAZ-MBK-IPI, TOPAZ-D-PMH-IPI, TOPAZ-D-MBK-IPI, TOPAZ-D-CSB-IPI Installation Manual • 2341-980_R10 • 11/15
8 in.
(203 mm)
SLP-TRAP
Horizontal Termination Cap
Heat
Shield
Term Cap
Max
Effective
Trap1
Length
Trap2
14-7/16 in.
367 mm
Minimum
Maximum
Effective Length
Effective Length
3-1/8 in.
4-3/4 in.
79 mm
121 mm
5-1/4 in.
9-1/4 in.
133 mm
235 mm
14-7/16 in.
367 mm
2-5/16 in.
59 mm
SLP-WT-BK
Wall Thimble-Black

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Topazd-pmh-ipiTopazd-mbk-ipiTopazd-csb-ipi

Table of Contents