Table Of Contents; Introduction; Check List; Approvals - Calomax Clipper 2 5L Installation, Operation And Servicing Instructions

Table of Contents

Advertisement

CONTENTS
EXPLODED DIAGRAM
WIRING DIAGRAM
PRODUCT SPECIFICATION
Page 2
page
3
3
3
4
4
4
5
5
6
6
6
7
8
8
8
9
11
12/13
14/15
16/17/18
19
20
21/22
23
24

INTRODUCTION

Thank you for purchasing a Calomax Clipper 2 range boiler. All our
products are designed to give years of simple, reliable operation. To
ensure this, it is important that the installation and subsequent servicing
is carried out by a suitably quali ed engineer in accordance with these
instructions.
For assistance in nding a suitable engineer in your area, visit our website
www.calomax.co.uk, contact our service department on 0113 249 6681 or
e-mail: service@calomax.co.uk

CHECK LIST

Before commencing installation, check that the following parts have been
supplied with the boiler:
1. 4 off wall xing screws and plugs.
2. 1 off solenoid adapter.
3. 1 off 15mm pipe elbow.
4. 1 off 15mm straight pipe tting.
5. 1 off status label

APPROVALS

This product conforms to the CE marking directive 93/68/EEC
through compliance with the following standards:
Electromagnetic Compatibility Directive
Low Voltage Directive 73/23/EEC in accordance with:
BS EN 60335-2-63:1993
Compliance with these standards has been con rmed through testing by
an independent NAMAS approved body
Calomax products have been tested and found to comply
with the requirements of the Water Supply (Water Fittings)
Regulations 1999 for England and Wales Water Bylaws 2000,
Scotland and the Water Regulations Ireland.
Page 3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Clipper 2 7.5lClipper 2 10lClipper 2 15l

Table of Contents