3 The installation of the Switch

In this chapter Introduce the installation of Switch.

3.1 list of articles

Open the packing box, carefully counted and should include the following components:
A Switch
A standard power cord
Four rubbers
Two pieces brackets for rack-mount and screws
A Manual
Check box in the switches and the supplementary items, if have damaged or missing, please
immediately contact the local distributor. You should be ready before installation tools and other cables.

3.2 Installation Method

When installation, need to seriously consider the following:
Must be on the surface at least can load 5 kg.
Must ensure that the power cord is reliably connected to the switch on the rear panel of power
between the interface and power supply socket.
Ensure the sides of the switch can be a good ventilation cooling, and do not place heavy objects on
the switches.
Power requirements: 100-240 vac 50/60 hz, power grounding is good.
Not in strong electromagnetic field, where the sun installation place, dust, vibration.
Placement of switches must be kept 10 cm from other objects before and after space, so that
ventilation and heat dissipation
When placed in a horizontal panel switches, can be included with the rubber mount, to prevent the
switches from bottom and surface friction.
Will switch installed on the bracket, it must be safe with screws
6