Remote Condenser - Manitowoc Indigo Series Technician's Handbook

Air/water/remote condenser ice machines
Hide thumbs Also See for Indigo Series:
Table of Contents

Advertisement

REMOTE CONDENSER

The power button must be depressed and the
NOTE:
water curtain/ice dampers must be in place on the
evaporator before the ice machine will start.
Initial Start-Up or Start-Up After
Automatic Shut-Off
1. Water Purge
Before the compressor starts, the water pump and
water dump solenoid are energized for 45 seconds, to
completely purge the ice machine of old water. This
feature ensures that the ice making cycle starts with
fresh water.
2. Refrigeration System Equalization and 
Start-Up
The harvest valve, air pump(s) and harvest pressure
regulating (HPR) solenoid valves energize to equalize
high and low side refrigeration pressure.
After 5 seconds the liquid line solenoid valve
energizes and the contactor energizes the compressor
and condenser fan motor.
108
Part Number STH025 8/12

Advertisement

Table of Contents
loading

This manual is also suitable for:

B970 series

Table of Contents