Mercedes-Benz 2008 GL 450 Operator's Manual page 314

2008 gl-class
Table of Contents

Advertisement

Installing the cargo net
Cargo net bar hung up behind the B-pillar
1 Holder
2 Cargo net bar
Hang cargo net bar 2 on holder 1 as
indicated by the arrow.
Push cargo net bar 2 forward into
holder 1 in direction of arrow.
Pulling the cargo net tight
Belt hook attached in the second-row foot-
well
1 Belt hook
2 Cargo tie-down ring
3 Tightening belt
Hook belt hook 1 into cargo tie-down
ring 2 in direction of arrow.
Pull tightening belt 3 by the loose end
in direction of arrow until the cargo net
is pulled tight.
After driving a short distance, make
sure the cargo net is still tight and, if
necessary, pull it tight again.
Controls in detail
Loosening the cargo net
Belt hook attached in the second-row foot-
well
1 Buckle
2 Belt hook
3 Cargo tie-down ring
Loosen the tightening belt by pulling
buckle 1 upward in direction of arrow.
Remove belt hook 2 from cargo
tie-down ring 3.
Loading
313

Advertisement

Table of Contents
loading

This manual is also suitable for:

2008 gl 320 cdi2008 gl 5502008 gl-classGl seriesGl 320 cdiGl 450 ... Show all

Table of Contents