Barco CINE 6 Installation Manual page 17

Hide thumbs Also See for CINE 6:
Table of Contents

Advertisement

After scan inversion, close the chassis, re-install the second top cover, the side covers and the lens top cover.
To install the side covers :
Hook the side cover on the both notches and
Secure on with the three black screws on the bottom side.
Reconnect the power cord to the wall outlet.
Note : Switching over from floor to ceiling or vice versa requires a complete readjustment of picture geometry
and convergence.
Check of the correct connector position
Note : this check procedure can only be done after power (mains) connection.
So, first continue with the projector set up and the connections and then return to this checking procedure.
Configuration when leaving the factory : ceiling / front configuration.
The three convergence yoke connectors are mounted with the coloured dots on them facing the convergence heatsinks.
For table / front mount
The three connectors must be reversed so that the heatsinks faces the plane surface.
R5975819.05 BARCO CINE 6 21112002 ____________________________________________________________________________ 4-3
Heatsink
Installation Set Up

Advertisement

Table of Contents
loading

Table of Contents