Definitions; System Power Up - Pace MBT 301 Operation And Maintenance Manual

Digital soldering/desoldering system
Table of Contents

Advertisement

WARNING:
1. Remove TD-100 and MT-100 handpieces while holding Tip Heater Cartridge with the Rubber
Pad; gently pull the THC from handpiece. For PS-90, SX-100, TT-65, and TJ-80 handpieces,
loosen heater set screw and remove iron tip with Rubber Pad.
2. Place the tip (still hot) in tip / tool stand.

Definitions

Please read and become familiar with the definitions of each of the following terms that are used
repeatedly in the following operational procedures.
Auto-Off: Safety feature that turns power off (1-90 minutes, settable in 1 minute increments) after the
system has entered Temperature Setback.
Normal Operation: Normal operating mode of the system in which the Operating Tip
Temperature is displayed.
Password: The Password feature of the MBT 301 system will prevent unauthorized alteration of
stored system temperature parameters and feature settings. If a Password has been installed,
the LCD Display will display an instruction to enter the password. Enter a four digit number selected
using the scroll up /down keys on the system front panel) when a setting change is attempted.
Programming Menu: The interface used to program the system features parameters (e.g.,
temperature limits, password, setback time).
Set Tip Temperature: The operator selected idle tip temperature entered into the system memory.
Temperature Adjust Mode: Mode of operation where the Set Tip Temperature may be adjusted.
Temperature Setback: System feature that will independently set back the Set Tip Temperature to
177°C (350°F) after a user selected or preset period of handpiece inactivity.

System Power Up

1. Insert the female end of the power cord into the AC Power Receptacle on the rear panel of
the power source.
2. Plug the prong end (male end) of the power cord into an appropriate 3 wire grounded AC
supply receptacle.
To insure operator and ESD/EOS safety, the AC power supply receptacle must be checked for
©2013 PACE Worldwide, Southern Pines, North Carolina All Rights Reserved
 
CAUTION
proper grounding before initial operation.
Page 12 of 18

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents