Use The Planning Documentation; Sso Authentication Login; Site Verification - Avaya G700 Installation And Upgrades

Hide thumbs Also See for G700:
Table of Contents

Advertisement

2
Installing Hardware for the G700 Media Gateway and S8300 Media Server
Getting Started

Use the Planning Documentation

To guide you in your preparations for the installation, use the Installer's Checklists (see
"Information
install the G700.
The planning documentation will provide you with information about:
What equipment you will be installing
What kind of system you will be integrating
Whom to contact on site about delivery, system questions, or network concerns
Whom to contact at your home office in case of questions
Whether you need a special pass or an escort
How to gain entrance to the installation location if it is locked
Where to install equipment
Where to find a telephone near the installation location

SSO Authentication Login

You should obtain a personal Single Sign-On (SSO) for Remote Feature Activation (RFA) website
authentication login before going to the site for installation. You must complete the authentication
process before you can be assigned an SSO authentication login.
As a first-time user:
Business Partners should point their browsers to the Business Partner portal option sales_market,
services-voice, training tools and procedures to select RFA (or go directly to:
http://rfa.avaya.com).
Associates should point their browsers to the Avaya Associate portal (or go directly to:
http://rfa.avaya.com).
Contractors should point their browsers to Avaya.com (or go directly to: http://rfa.avaya.com).
From that point, log into SSO and complete the process to obtain your personal login.

Site Verification

A pre-installation site inspection allows you to verify that the site requirements have been met for
adequate environmental conditions, power and grounding availability, safety, and security conditions. If
you find discrepancies between the specifications necessary for proper installation of equipment and the
conditions on site, contact your Project Manager before proceeding with the installation.
76
Checklists") to verify that you have the tools, software, and information that you need to
Installation and Upgrades for G700 and S8300
Appendix B,
December 2003

Advertisement

Table of Contents
loading

This manual is also suitable for:

S8300

Table of Contents