Chapter 2: Before you install
Read this chapter carefully before you begin the installation. If you are installing the G350 at a
customer site, read this chapter before going to the customer site.
This chapter includes:
Before going to the site
●
Site requirements
●
Unpacking
●
Before going to the site
Before going to the site, work through the following sections to prepare required information and
equipment.
Read the planning documentation
Before you begin the installation, read the planning documentation.
The planning documentation provides you with information about:
Whether an S8300 Media Server module is included in the installation. The process of
●
installing the G350 is different depending on whether or not an S8300 is included.
Which voice devices and data devices need to be connected to the G350.
●
Whom to contact on site about delivery, system questions, or network concerns.
●
Whom to contact at your home office in case of questions.
●
Whether you need a special pass or an escort.
●
How to gain entrance to the installation location if it is locked.
●
Where to install equipment.
●
Where to find a telephone near the installation location.
●
on page 19
on page 24
on page 26
Issue 3.1 June 2006
19