Chapter 2: Before You Install; Before Going To The Site; Read The Planning Documentation - Avaya G350 Installing And Upgrading

Hide thumbs Also See for G350:
Table of Contents

Advertisement

Chapter 2: Before you install

Read this chapter carefully before you begin the installation. If you are installing the G350 at a
customer site, read this chapter before going to the customer site.
This chapter includes:

Before going to the site

Site requirements
Unpacking
Before going to the site
Before going to the site, work through the following sections to prepare required information and
equipment.

Read the planning documentation

Before you begin the installation, read the planning documentation.
The planning documentation provides you with information about:
Whether an S8300 Media Server module is included in the installation. The process of
installing the G350 is different depending on whether or not an S8300 is included.
Which voice devices and data devices need to be connected to the G350.
Whom to contact on site about delivery, system questions, or network concerns.
Whom to contact at your home office in case of questions.
Whether you need a special pass or an escort.
How to gain entrance to the installation location if it is locked.
Where to install equipment.
Where to find a telephone near the installation location.
on page 19
on page 24
on page 26
Issue 3.1 June 2006
19

Advertisement

Table of Contents
loading

Table of Contents