Given a realistic scenario depicting a new site install, the learner will be able to install and setup the brewer
for customer turnover without error.
Given an installed machine, all the necessary tools and safety equipment, the learner will be able to
set the machine up for initial operation.
The learner will be able to operate the switch controls.
The learner will be able to enter programming.
The learner will be able to perform the flow calibration of the brew tank and hot water tank.
The learner will be able to perform a brew process.