Autopod™ With Pump; Electrical Install; Initial Start-Up - Bunn AutoPOD Technical Training Manual

Table of Contents

Advertisement

AutoPOD™ with Pump Model
Pressure regulator with fittings secure to the .75-11.5 NH (Hose Thread) fitting at the rear of the brewer and turn on
the water supply

Electrical Install

Step 1: Plug-in the attached cordset from the brewer into a conventional 120VAC outlet.
Step 2: The brewer LCD (Liquid Crystal Display) will light up and the brewer is ready for the initial setup.

Initial Start-Up

Step 1: Place a large empty cup under the brew chamber.
Step 2: Connect the brewer to the power source.
Step 3: Water will flow into the Hot Water tank and stop when the tank is filled to its capacity.
Step 4: Open, then close door with switch.
Step 5: Press the Large Brew Switch. Water will flow into the Brew tank. Some excess water will flow into the cup.
Step 6: Wait approximately ten minutes for the water in the tank to heat to the proper temperature. Display will show
HEATING until tank reaches it's operating temperature. Some water will drip from the brew chamber during this time;
this is due to expansion and should not occur there after.
Step 7: Water volumes and flow settings have been preset at the factory. Increase or decrease the settings as
needed.
Step 8: The brewer is now ready for use in accordance with the instructions for coffee brewing.
START-UP MODE
BREW TO FILL TANK
PLEASE WAIT
DOOR CLOSING
PRESS OPEN
PLEASE WAIT
TO LOAD POD
DOOR OPENING
SELECT BREW
PRESS CLOSE
BREWING
COMPLETE
Bunn-O-Matic Corporation
HEATING
5

Advertisement

Table of Contents
loading

Table of Contents