Bunn AutoPOD Technical Training Manual page 20

Table of Contents

Advertisement

□ Insert 26367.0000 cleaning brush from the underside into the coffee outlet hole (rear) and work back and forth
□ Use clean wash cloth and wipe out the lower stream guide bowl and the cap removed earlier
□ Reinstall bowl cap by aligning the tab and notch and snapping back into position
Step 3: Clean drip tray and pod bin removed earlier
□ Separate the parts and wash with mild nonabrasive liquid detergent
□ Reassemble components and install when PM is complete
Step 4: Remove inlet valve connector fitting and clean inlet valve strainer
□ Using your hand and unscrew the valve adapter fitting and set aside
□ Using the needle nose pliers gently grab the strainer tab and pull the strainer out of
the valve
□ Clean and rinse strainer of any sediment or mineral build-up
□ Reinstallation is the opposite of removal
Step 5: Remove and clean refill probe
□ Remove refill probe with the pink wire attached by gently prying upward with a stan
dard blade screwdriver or by the use of pliers and pull tightly fitted probe out of grom
met
□ Clean the refill probe of any mineral build up. Use of a deliming solution is recom
mended
□ Install clean refill probe with pink wire back into grommet. Warning – Do not push
grommet into tank! Wet the refill probe and gently rotate back and forth while pushing
the probe downward until it stops
Step 6: Remove and clean thermistor in each tank
□ Disconnect the thermistor 2 pin connector from the CBA labeled "Hot Water"
□ Disconnect the thermistor 2 pin connector from the CBA labeled "Brew Tank"
□ Remove bottom snap clamp from each of the braided tube with the thermistor and remove braided tube with the
thermistor from each tank
□ Clean both thermistors of any mineral build up. Use of a deliming solution is recommended. Do Not Immerse the
Wires!
□ Reinstall clean thermistors
□ Re-connect the thermistor 2 pin connectors back onto the CBA in their appropriate labeled connectors
Step 7: Calibrate the flow for the Brew tank
□ Install top cover and rear cover
□ Reinstall water and connector fitting
□ Reinstall power
□ Reinstall pod bin & drip tray
□ Access programming and go to CALIBRATE FLOW ? menu
□ Depress YES button
□ Place graduated measuring cup (minimum 10 ounces) under coffee outlet
□ Follow the instruction on the display
□ After dispense finishes, read number of ounces and enter that amount into brewer using the +/- switches, then
press DONE to set the volume into memory
20
AutoPOD™ Training Manual

Advertisement

Table of Contents
loading

Table of Contents