HP R12000 User Manual page 34

Directflow ups
Hide thumbs Also See for R12000:
Table of Contents

Advertisement

To install the battery pack:
Power down the UPS before installing the battery packs. For more information, see "Powering down the
1.
UPS (on page 33)."
Install the mounting rails.
2.
With one person on each side of the carton, lift the chassis and lower it to the floor in front of the rack.
3.
With one person on each side, lift the chassis to rail level and slide the chassis on the mounting rails.
4.
For shipping or relocating a populated rack, secure the rear of the chassis to the rails by mating the
chassis slots to the shipping bracket tabs.
Attach the chassis to the rack using the supplied screws.
5.
To complete the installation, see the following instructions:
Installing the lithium-ion batteries (on page 35)
1.
Attaching the 1U battery pack front bezel (on page 35)
2.
Connecting the 1U battery pack to the 1U power unit (on page 35)
3.
Connecting the 1U battery pack to the 2U power unit (on page 37)
4.
Charging lithium-ion batteries (on page 39)
5.
Installation 34

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

R18000

Table of Contents