6. Supply Wiring
The LC1000-100/LC1500-100 controller is powered by -48VDC from the shelter. A field-supplied 5 amp DC circuit
breaker is required. Field-supplied supply wiring should be minimum 16 guage, maximum 14 guage (see Figure
1.25). A reliable earth ground must be connected in addition to any grounding from conduit. Grounding posts are
included with the controller for this purpose; install as shown in Figure 1.26. Failing to ground the controller box
properly could result in damage to the equipment.
Bard-Link
Manual 2100-620A
Page
32 of 107
FIGURE 1.25
LC1000-100/LC1500-100 Controller Circuit Install
TM
The Bard-Link
additional 5-amp DC breaker (field supplied) and minimum 16 gauge
supply wire.
-48VDC termination at controller: Bring the -48VDC power supply wires
through conduit to the controller box. Land the positive (+) 48VDC wire
to terminal #1 and the negative (-) 48VDC wire to terminal #2.
NOTE: If the DC wiring is not terminated correctly on the
specific polarity-indicated terminals of the PLC block, the
PLC controller will not activate and will not function. Verify
polarity of connections and wait to initialize controller until
"startup procedures."
FIGURE 1.26
Controller Grounding Posts
controller requires a separate -48VDC power supply, an
TM
A reliable earth ground must be connected in
addition to any grounding from conduit. Attach
earth ground to dedicated lugs on side of controller
box. Failing to ground the controller box properly
could result in damage to the equipment.