Hardware Installation; Step 1: Unpacking; Packing Contents Of Dgs-1100-16/18/24/24P/26; Step 2: Switch Installation - D-Link DGS-1100-16 Reference Manual

Dgs-1100 series switch
Hide thumbs Also See for DGS-1100-16:
Table of Contents

Advertisement

3.

Hardware Installation

This chapter provides unpacking and installation information for the D-Link Switch.

Step 1: Unpacking

Open the shipping carton and carefully unpack its contents. Please consult the packing list located in
the User Manual to make sure all items are present and undamaged. If any item is missing or
damaged, please contact your local D-Link reseller for replacement.

Packing contents of DGS-1100-16/18/24/24P/26

One D-Link DGS-1100 Series Switch
One AC power cord
Four rubber feet
Screws and two mounting brackets
One accessory kit for a ground screw
One Multi-lingual Getting Started Guide
One CD with User Manual
If any item is found missing or damaged, please contact the local reseller for replacement.

Step 2: Switch Installation

For safe switch installation and operation, it is recommended that you:
Visually inspect the power cord to see that it is secured fully to the AC power connector.
Make sure that there is proper heat dissipation and adequate ventilation around the switch.
Do not place heavy objects on the switch.

Desktop or Shelf Installation

When installing the switch on a desktop or shelf, the rubber feet included with the device must be
attached on the bottom at each corner of the device's base. Allow enough ventilation space between
the device and the objects around it.
Figure 3-1 – Attach the adhesive rubber pads to the bottom
D-Link DGS-1100 Series Switch User Manual
8
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dgs-1100-24Dgs-1100-18Dgs-1100-26Dgs-1100-24p

Table of Contents