Hitachi RCI-1.0FSN3 Service Manual page 58

Indoor units system free series & complementary systems fsn(h)(2/3/4)(e/m)(i)(-du)
Table of Contents

Advertisement

2 Unit installation
Partially built-in unit installation
Where a false ceiling is already installed, install and prepare the pipes and cables on the indoor unit before lifting it.
Cut the area of the unit in the false ceiling and reinforce the opening made.
C A U T I O N
Before lifting the unit, prepare any necessary means
(ladders, scaffolding, elevator platform, etc.) and check
that the current safety regulations in the place where the
installation is taking place are met.
Check that the lifting work can be carried out without the
risk of injuries to you or others in the surrounding area
Request the assistance of another person to lift the unit.
Hang the indoor unit on the suspension brackets, inserting the unit assembly bolts on the notches in the brackets.
Fit the nuts, flat washers and spring washers supplied to secure the indoor unit.
Insulate the top of the unit that will be hidden in the ceiling. Gaps
may cause air leaks or condensation.
Model
RPC-(2.0-3.0)FSN2E
RPC-(4.0-6.0)FSN2E
Fit the false ceiling panels along the unit.
Continue for all installation types:
Check that the condensate discharge system in the indoor unit
works correctly. To do so, check the level of the drain pan using a
spirit level or a clear flexible pipe full of water. The rear of the unit
where the drain hose is located must be around 3 mm lower than
the front side.
Secure the drain hose with the clamp and adhesive supplied.
46
SMGB0077 rev.0 - 01/2013
Model
RPC-2.0FSN2E
RPC-(2.5-4.0)FSN2E
RPC-(5.0-6.0)FSN2E
A
13
75
A
1560
1780
2040

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents