Preliminary Operations - Husqvarna TC 449 2011 I.E. Workshop Manual

Hide thumbs Also See for TC 449 2011 I.E.:
Table of Contents

Advertisement

H01939
H01938
ENGINE DISASSEMBLY/REASSEMBLY
TC 449 2011/2012 I.E.
TE 449 - 511 2011/2012 I.E.
TXC 449 - 511 2011/2012 I.E.
SMR 449 2011 I.E.
SMR 511 2011/2012 I.E.
REMOVING AND ASSEMBLING OR REPLACING PRESSURE OIL PUMP

Preliminary operations

Engine oil drainage
Gear lever disassembly
Engine left crankcase cover disassembly
Oil force pump disassembly
• Disassemble the following parts:
- Stop ring (1)
- Cover (3) with seal (2)
- Inner rotor (4)
- Outer rotor (5)
- Needle roller (6)
Oil force pump assembly
• Lubricate needle roller (6), outer rotor (5), and inner rotor (4).
Molykote D Paste
• Assemble the following parts:
- Needle roller (6)
- Outer rotor (5), and inner rotor (4) with reference mark pointing out
- Cover (3) with seal (2)
- Stop ring (1)
Consumables
Clear solid lubricant
for metal part
assembling and
settling
F1.65
Workshop Manual Ed. 03-2012

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents