8

Reports

8
Reports
8.1

Start-up report

Please check off the start-up tasks carried out and
enter the corresponding readings.
Initial start-up tasks
1. Type of gas:
2. Inspect to check for leaks
(see subsection 2.2.1 on page 31)
3. Check combustion air/flue gas connection
(see subsection 2.2.4 on page 33)
4. Checking the boiler equipment (change to another type of gas if
necessary) (see subsection 2.2.4 on page 33)
5. Carry out adjustment settings
(see subsection 2.2.6 on page 35)
6. Measure the gas connection pressure (working pressure)
(see subsection 2.2.5 on page 34)
7. Checking and adjusting the gas/air-ratio
CO
-content:
at full load
2
at part load
(see subsection 2.2.8 on page 37)
8. Leak test in operational condition
9. Measure carbon monoxide content (CO), vacuum
(see subsection 2.2.9 on page 37)
10. Function testing
Measuring the ionisation current
(see subsection 2.2.10 on page 38)
11. Fit the boiler casing
12. Instruct the user. Fill in Benchmark log book.
Hand over documentation.
(see subsection 2.2.12 on page 39)
13. Confirm initial start-up
Confirmation of initial start-up by qualified service technician
(Company stamp, signature)
Buderus • http://www.buderus-domestic.co.uk
66
Installation and servicing instructions for wall-mounted condensing gas boiler Buderus 600 - 11R/19R/24R • 02/2006
Remarks or measurement readings
Natural gas
LPG
_____________________ mbar
_____________________ Pa
_____________________ %
_____________________ %
_____________________ ppm
_____________________ µA
Subject to modifications resulting from technical improvements!

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

600 - 19r600 - 24r

Table of Contents