Download Print this page

Master Schedules Tab - Aprilaire 8825 Installation, Configuration And User Manual

System controller

Advertisement

& '
There are two types of schedules on the System Controller: Individual Schedules and Master Schedules.
Individual Schedules apply only to a specific thermostat, so making changes to the Individual Schedule
on one thermostat does not change the setting on any other thermostat.
Master Schedules apply to all thermostats that have been set to follow that Master Schedule.
Use the Schedule page to:
Select which schedule to run on a thermostat. You can choose to run the thermostat's Individual
Schedule or you can specify that the thermostat should run one of the Master Schedules.
Make changes to a thermostat's Individual Schedule.
Copy a Master Schedule into the thermostat's Individual Schedule.
Note that you cannot make changes to a Master Schedule from the individual thermostats: use the
Master Schedules tab at the left instead.
To change a thermostat's currently active schedule:
1. On the Thermostat Settings tab, select the desired thermostat from the row of tabs at the bottom.
2. At the top of the page, the Active Schedule window shows which schedule is active. It can be the
Individual Schedule or one of the named Master Schedules.
3. Click Next or Prev until the desired schedule has been selected.
(
!

Advertisement

loading