Sym Mio 50 Service Manual page 10

Table of Contents

Advertisement

Lubricate the rotation face with specified
lubricant on the lubrication points before
assembling.
Check if positions and operation for installed
parts is in correct and properly.
Make sure service safety each other when
conducting by two persons.
Note that do not let parts fall down.
Before battery removal operation, it has to
remove the battery negative (-) cable firstly.
Notre tools like open-end wrench do not contact
with body to prevent from circuit short and
create spark.
To this chapter contents
After service completed, make sure all
connection points is secured.
Battery positive (+) cable should be connected
firstly.
And the two posts of battery have to be greased
after connected the cables.
Make sure that the battery post caps are
located in properly after the battery posts had
been serviced.
If fuse burned, it has to find out the cause and
solved it. And then replace with specified
capacity fuse.
1. General Information
Capacity
verification
1-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents