5. Removal & Installation of Engine
Installation of Engine
Install the engine according to the reversing order
of removal.
Caution
Note both feet and hands safety for
squeezing as engine installation.
Do not bent or squeeze each wires or hose.
Route all cables and wires in accordance with
the routine layout.
Engine hanger nut:
Torque Value: 4.5~5.5kgf-m
Rear cushion bolt:
Torque Value: upper¡ G 3.5~4.5kgf-m
under¡ G 2.4~3.0kgf-m
Rear wheel axle nut:
Torque Value: 11.0~13.0kgf-m
5-8
To this chapter contents