Feed Support Assembly - Andrew ES45T Installation, Operation And Maintenance Manual

Andrew installation, operation and maintenance 4.5-meter earth station antenna es45t
Table of Contents

Advertisement

Feed Support
Assembly
Step 1
Step 2
By now, you can see that your installation of the 4.5-Meter Earth Station Antenna is
almost complete. The feed system is the last phase of the base installation described in
this manual.
Note: All antenna options (such as feeds, shields, anti-icing, etc.) possess installation
instructions within the individual kits contained in the shipment.
Attach feed struts to 222930 feed support as shown in Figures 52 and 53.
Use 3/8 x 2 in. bolt, lockwasher and nut
Install supplied feed system according to installation instructions provided with applica-
ble feed system.
Figure 52
Figure 53
45
Installation Procedures

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents