ES45T-R Reflector Assembly
Step 14
Raise lower portion of reflector/backstructure assembly and attach remaining end of ele-
vation strut to elevation axis bracket of main triangle assembly.
Use 3/4 x 4-1/2 in (114 mm) bolt, lockwasher and nut
Mechanical means or fine adjustment assembly may be utilized to achieve elevation
angles greater than 30°.
Step 15
Set fine elevation and azimuth strut positions based on the procedure performed in the
Elevation and Azimuth Adjustments section.
If fine alignment is not performed at this time, continue the assembly procedure at
Step 16.
Step 16
Securely tighten U-bolts and elevation strut mounting hardware.
Step 17
Remove both fine adjustment assemblies and store in a weather protected location for
future use. Continue with feed system and corresponding LNA installation.
You have now completed the attachment of the reflector to the tripod ground mount
assembly. If installing an ES45T-R antenna, advance to the Elevation and Azimuth
Adjustments section for instructions on pointing your antenna to its satellite.