Preparation For Use And Operation; Unpacking And Checking The Delivery - Fujitsu Siemens Computers SCENIC S 2 Operating Manual

Table of Contents

Advertisement

Preparation for use and operation

Please pay careful attention to the safety information provided in the "Important notes"
!
chapter and in the "Safety and Ergonomics" manual.

Unpacking and checking the delivery

We recommend that you retain the original packaging material, as it may be required for
transportation at a later date.
Ê
Unpack all the individual parts.
Ê
Check the delivery for damage incurred during transportation.
Ê
Check whether the delivery agrees with the details in the delivery note.
Should you discover that the delivery does not correspond to the delivery note, notify your local
sales outlet immediately.
If you have received drives or boards with your PC, please do not install them until after
i
first-time installation. How to install drives and boards is described in the "System
expansions" chapter.
The supplied power cable conforms to the requirements of the country in which you
!
purchased your device. Make sure that the power cable is approved for use in the country
in which you intend to use it.
A26361-K650-Z100-1-7619
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents