Installation - Empire Comfort Systems DVCD32FP30P-1 Installation Instructions And Owner's Manual

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVCD32FP30P-1:
Table of Contents

Advertisement

Framing and Finishing
1.
Choose unit location.
suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
4.
Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
29354-1-1012

INSTALLATION

Figure 9
Vent Pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent pipe.
See Fig. 9. For horizontal vent, maintain a minimum 1" clearance to
the bottom and sides of the vent, and 3" clearance to combustibles
above the vent pipe. See Figure 10.
Figure 10
Figure 11
Page 13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents