Vertical Termination - Empire Comfort Systems DVCD32FP30P-1 Installation Instructions And Owner's Manual

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVCD32FP30P-1:
Table of Contents

Advertisement

vent rise is between 10 feet and 40 feet. To maintain the yellow
from your Empire Comfort Systems, Inc. distributor or dealer for
Simpson Duravent only.
the air inlet pipe. A decrease in the height or the appearance of the
vertical top.
Please use the following steps to install the vertical inlet
openings on the direct vent high wind vertical top.
2. There are three sections of air openings on the exterior of the
air inlet pipe.
To achieve the maximum
To achieve the minimum
top with (2) 3/8" hex-head screws provided with vertical inlet
Description
3/8" Hex-Head Screw
the vertical or horizontal position, replace horizontal and vertical pipe
lengths, elbows and horizontal or vertical termination kit.
All vent system components lock into place by sliding the concentric
pipe section with four (4) equally spaced interior beads onto the
appliance collar or previously installed component end with four
(4) equally spaced indented sections. When the internal beads of
each starting outer pipe line up, rotate pipe section clockwise 90°
(approximately 3 inches). The vent pipe is now locked together.
and locked into the preceding component in the vent system.
Whenever the glass frame assembly is pivoted open by a delayed
ignition in the main burner, the glass frame assembly gaskets and
for damage. All damaged gaskets on the glass frame assembly and
If damage occurs to the combustion chamber, it must be replaced
Inc. for replacement parts.
29354-1-1012
VERTICAL TERMINATION (continued)
Parts List
Part
Quantity
Number
Supplied
DVF-139
1
R-2656
2
Vertical Through the Roof Applications (Figure 54)
a) Vertical installations up to 40 feet in height.
b) Two sets of 45 degree elbow offsets within these vertical
installations. From 0 to a maximum of 8 ft. a vent pipe can be
used between elbows.
and use the appropriate venting components.
Canopy Installation
1.
Remove canopy from open area above glass. Remove and
discard packaging.
2.
Place canopy over open area above glass as shown in Figure
55.
pack (1 screw each side).
Figure 54
Figure 55
Page 35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents