Framing and Finishing
1.
Choose unit location.
suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).
4.
Use (8) 1/2" hex-head screws supplied in hardware package,
to screw through slotted holes in drywall strip and then screw
29354-1-1012
INSTALLATION
Figure 9
Vent Pipe Clearance
Note: Maintain one inch (1") of clearance around vertical vent pipe.
See Fig. 9. For horizontal vent, maintain a minimum 1" clearance to
the bottom and sides of the vent, and 3" clearance to combustibles
above the vent pipe. See Figure 10.
Figure 10
Figure 11
Page 13