Fbb4 Optional Variable Speed Blower Installation - Empire Comfort Systems DVCD32FP30P-1 Installation Instructions And Owner's Manual

Direct vent zero clearance gas fireplace heater
Hide thumbs Also See for DVCD32FP30P-1:
Table of Contents

Advertisement

FBB4 OPTIONAL VARIABLE SPEED BLOWER INSTALLATION

Attention
supply line
Note
It is recommended that an ON/OFF wall switch be installed
that will activate the power supply to the furnace by a
4. Refer to page 55, "Junction Box Wiring Installation Instructions"
to complete wiring of junction box.
Attention
necessary, remove gas inlet supply line.
Wiring
The appliance, when installed, must be electrically grounded in
accordance with local codes or, in the absence of local codes,
with the National Electrical Code, ANSI/NFPA 70, if an external
electrical source is utilized. This appliance is equipped with
a three-prong [grounding] plug for your protection against
grounded three-prong receptacle. Do not cut or remove the
grounding prong from this plug. For an ungrounded receptacle,
an adapter, which has two prongs and a wire for grounding, can
be purchased, plugged into the ungrounded receptacle and its
wire connected to the receptacle mounting screw. With this wire
completing the ground, the appliance cord plug can be plugged
into the adapter and be electrically grounded.
servicing controls. Wiring errors can cause improper
and dangerous operation. Verify proper operation after
servicing.
Blower Motor
The blower motor does not have oiling holes. Do not attempt to
oil the blower motor.
Blower Wheels
The blower wheels will collect lint and could require periodic
cleaning. If the air output decreases or the noise level increases,
it indicates a dirty blower wheel. Remove fan and clean blower
wheels.
heater from cycling. To turn off gas to the heater (millivolt
to "OFF." Do not force. To turn off gas on direct ignition
model, turn gas line valve to "OFF."
29354-1-1012
5. Insert blower assembly into interior, bottom of fireplace.
Position blower assembly behind gas valve, align notch
magnets on the back and bottom of blower assembly will
6. Position speed control box to the right of gas valve. Attach
box in place.
insert base of fan control switch under the mounting tabs on
8. Insert power cord plug into junction box.
10. Installation of FBB4 optional variable speed blower assembly
is completed.
Note: Refer to wiring instructions on page 54 for proper
operation.
Page 53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents