Bowflex Ultimate 2 Assembly Instructions Manual page 24

Table of Contents

Advertisement

23
STEP 22 (optional attachment)
Parts:
• Ab Crunch Frame
• Ab Crunch Pivot Arm
Tool:
• Hex Key (7/32")
• Wrench (9/16") - or Adjustable Wrench
22-1 Place Ab Crunch Frame on fl oor with hooks
on the top and pulley end pointing away
from you.
22-2 Align Ab Crunch Pivot Arm on Ab Crunch
Frame with the pivot mechanism to the right
side as shown.
22-3 Install and completely tighten hardware.
Hardware (1:1):
2 Button Head Screws (3/8" X 4")
STEP 23
Parts:
• Ab Crunch Assembly (from step 21)
• Ab Handle Bars
Tool:
• Hex Key (7/32")
• Wrench (9/16") - or Adjustable Wrench
23-1 Place the Ab Handle Bars on the Ab Pivot Arm with
the Handle Bars pointing toward the same side as
the hooks on the Ab Frame as shown.
23-2 Install and completely tighten hardware.
Hardware (1:1):
Hardware for this step is in the hardware
2 Button Head Screws (3/8" X 3")
Assembling Your Bowflex Ultimate
Pivot Arm pointing to right
bag in the AB BOX.
Washer
Button Head
Screw
4 Washers (3/8")
Ab Handle Bars
Washer
Button Head
Screw
Ab Frame
4 Washers (3/8")
2
Hex Nut
Ab Crunch Frame
Hooks on top
2 Nylock Nuts (3/8")
Hooks
2 Hex Nuts (3/8")
Pulley
pointing
away
Hex Nut

Advertisement

Table of Contents
loading

Table of Contents