11. Reinstall the front covers, starting with the bottom cabinet (see
Figure 21).
Hang the top edge of the cover on the cabinet first, then lower the
bottom edge and snap into place. Be sure the cables fit in the
access holes in the covers.
12. Continue to "Stabilizing the Cabinet" on page 31 to complete the
parallel UPS installation.
®
EATON Powerware
9155 Parallel UPS (8–15 kVA) User's Guide
Figure 21. Reinstalling the Front Covers
S
164201592 Rev C www.powerware.com
INSTALLING OPTIONS
29